Nidec Conversion is proud to announce its contribution to one of the most significant energy storage initiatives in the Baltic region: Ignitis Group’s Battery Energy Storage System (BESS) project in Lithuania, totalling 291 MW / 582 MWh across three strategic sites.

The project, led by Ignitis Group and integrated by Rolls-Royce’s Power Systems division, represents a major milestone in Lithuania’s energy transition. As part of the program, Nidec Conversion has supplied its state-of-the-art Power Unit, a compact, high-performance system now part of the safe and efficient architecture of these BESS facilities.

Ignitis Group, a renewables-focused integrated utility and the largest listed company in the Baltic States, selected Rolls-Royce to deliver mtu EnergyPack battery storage systems. The order – Rolls-Royce’s largest (for BESS) to date – covers systems with a total storage capacity of 582 MWh and output of 291 MW, scheduled to support Lithuania’s power grid from 2027 onwards. The storage systems will be installed at three locations: Kelmė and Mažeikiai wind farms, and near the Kruonis Pumped Storage Hydroelectric Power Plant. By storing surplus electricity from renewable sources and releasing it during peak demand, the BESS facilities will help balance the grid, facilitate the integration of more green capacities, and strengthen energy security across the region.

Nidec Conversion’s Power Unit contributes significantly to this solution, also, thanks to its structure. It is, in fact, composed by a skid-mounted system that integrates a Power Conversion System (PCS) cabinet, a transformer, and Medium Voltage (MV) switchgear. This all-in-one design ensures reliable, flexible, and efficient integration for utility-scale projects. Compact in size, the Power Unit offers high power density and low noise levels, making it suitable for space-constrained or sensitive environments. Backed by decades of expertise in power electronics, it delivers proven reliability and cutting-edge technology tailored to the most demanding grid applications.

“We are honoured to support one of the largest BESS projects in Lithuania with our advanced Power Unit technology,” said Dominique Llonch, President of Nidec Energy and President and CEO of Nidec Conversion. “This collaboration with Rolls-Royce Power Systems demonstrates our commitment to enabling a secure, sustainable, and resilient energy system, while reinforcing our role as a trusted partner in the global energy transition.”

The BESS systems are expected to be fully operational by 2027.

For further information visit the website: www.nidec-conversion.com

For  more news, visit: https://essmag.co.uk/category/news/